Name: MARTIE
Surname: BOSHOFF
Location: HEIDELBERG
Entry Date: Aug 3, 2023
Category: DIY
Project: Bathroom

About the Project:

I revamped the whole bathroom. I took everything out, changed to toilets for business use, took all existing tiles off the wall and floor, took out the bath and basin and replastered the walls. I also tiled the floor, painted the walls and ceiling, divided the bathroom with drywall for two separate toilets and made…

Read More

I revamped the whole bathroom. I took everything out, changed to toilets for business use, took all existing tiles off the wall and floor, took out the bath and basin and replastered the walls. I also tiled the floor, painted the walls and ceiling, divided the bathroom with drywall for two separate toilets and made a new basin with wood. We made the taps ourselves and the shelves in the toilet with repurposed wood (Oregon pine) from the house. We decoupaged the doors and the walls in the toilets. The mirror was made from a repurposed window frame and old picture frame. The taps are made of galvanized pipes which I spray-painted. I made the toilet roll holders myself. We covered the one wall with polystyrene ceiling tiles and painted the other walls. We took out the existing windows and replaced them with new ones made by us. Me, my husband and two of our workers did all the work ourselves.

Budget Breakdown:

Materials:
Cement
1500
Plaster primer
1200
Floor tiles
1800
Wall ceiling tiles (polystyrene)
500
Paint
1200
Fittings
2000
Decoupage prints
1350
Modge podge
320
Ceiling cornice
2100
Cornice glue
380
Plumbing fittings
1700
Rope holders x2
250
Dry wall + accessories
3500
Doors x 2
700
Windows and glass
2500
Galvanized basins x 2
1400
Stickers
800
23200

Contractors:

Used two of our own workers for two weeks
6500
6500
Grand Total
R29700